See my signature, should get it between 8-10 weeks
So wait, you're going to have two? Now I'm jealous.On order:
Cherokee Limited
2.4L, AD1, Deep Cherry Red, Cold Weather Group, Tow Group, Iceland Gray Leather.
Supposed to be here end of January.
AJ
In the driveway:
Cherokee Trailhawk
3.2L, ADL, Brilliant Black, Cold Weather Group, Tow Group, Morocco Leather, No decal.
Love it.
My Limited was built 2 days after its expected ship date, in one morning, and then delivered 2 days before it was estimated to be at my dealer. LOLIf my Trailhawk is going to ship on Dec. 11, they had better get to building soon! Trying to be patient, but it is a real test. I know it is just an estimated ship date, but I have faith in them. Several others on MOTS are scheduled to ship around the same time and they are still in D1 Production Scheduled Status, too. I sure am hoping to have it by Christmas.
Rumor has it that Chrysler authorized overtime so they will be working straight through the holidays to they and catch up with the back orders. They are still on tap to try and pump out 500,000 Cherokees next year.With the holidays coming up, does anyone know if the Toledo plant will be on shutdown for a week or two?
May I suggest you go read Allpar which is considered to be the authority on all things Chrysler?I don't believe they want to build 500,000 Cherokees. The article I read said they wanted to produce 500,000 vehicles in Toledo next year but they also produce the Wrangler in Toledo and I believe that was included for the total.