Hey everyone!
I haven't seen a thread like this yet, but apologies if one already exists.
What is the status of your 2020 cherokee order?!?!!!
I ordered a trailhawk on 7/11 and am currently in D1 status with an est. ship date of 8/10. I've been following a wrangler build status thread and it seems like some of the new '20 models are already arriving at dealers with many more scheduled to be delivered within the coming week. I know the new MY wranglers started production in late July...anyone know if cherokees started around the same time, or are they starting now in August?? The waiting game sucks, but will be totally worth it! :grin:
Here is a copy of FCA vehicle order codes for reference...from
https://www.jeepfan.com/tech/chrysler-jeep-vehicle-order-codes/
Unscheduled:
BX – good order available for scheduling
BB – fleet order only – review by bid department
BD – special equipment processing
BE – edit error – coding error which must be corrected before order can be scheduled
BG – order has passes edit but cannot be scheduled regardless of sold status
Reason Codes:
F – finance hold – automatic cancellation after 15 days
B – model or option build out
L – material restriction
M – material hold (fleet)
ZA – canceled order
Scheduled:
C – tentative schedule
D – firm schedule: serial number assigned, approx time in station – 5 days
D1 – gateline: unit sequenced for production, est ship date assigned, Approx time in station – 12 days
Build:
E – framing
F – paint
G – trim
Built:
I – unit built, pending final inspection
J – vehicle passed final inspection but not released to carrier
JB – shipped to body vendor
JE – shipped to emissions
JJ – consigned to body vendor
JS – shipped to storage
KZ – released by plant and invoiced
Traffic Codes:
KZ L – released but not shipped KZ M – first rail departure
KZ N – first rail arrival
KZ O – delayed/received
KZ OA – plant hold, quality audit
KZ OB – zone, dealer, sales, vehicle prep, tax, diversion or derailment hold, dealer refusal, vehicle diverted
KZ OC – carrier delay, strike-bound, emission or safety hold, rail car shortage, bad or insufficient load, inclement weather, need shipping order, manifest error
KZ OD – mechanical failure, glass damage, vehicle in repair, lacking parts or storage hold
KZ OE – misdropped or misshipped vehicle
KZ OF – shipped air freight, stolen vehicle recovered, show vehicle, test info code, vessel sailed
KZ OG – damaged vehicle, stolen vehicle, abandon to carrier, vehicle scrapped, donate vehicle, repair and auction
KZ OH – all other “O” type carrier codes
KZ T – second rail departure
KZ U – second rail arrival
KZ X – delivered to dealer
KZ Y1 – major damage – must not be sold as new
KZ Y2 – major damage – vehicle sold at auction